Skip to main content
FCI-based Capital PlanningMulti-site ManagementQR Code Mobile AccessCompliance Automation

Stop Fighting Spreadsheets. Start Managing Facilities.

One Platform. Every Building. Complete Control.

Real-time FCI tracking across unlimited sites, automated PM schedules that prevent workload pileups, and mobile QR scanning for instant asset access. Discover proactive facilities management solutions.

Unlimited
Sites & Buildings
3-Tier
System Classification
Rolling
PM Schedules
20Y
FCI Forecasts

The Facility Manager's Daily Nightmare

Spreadsheets for assets. Emails for work orders. Sticky notes for PM schedules. No idea what your FCI is.

Capital Budget Guesswork

Your CFO asks "What capital do we need next year?" You panic. You manually check asset ages in Excel, guess at replacement costs, and hope for the best.

Wrong budgets = emergency replacements

PM Schedule Chaos

Your quarterly PM schedule puts 40 tasks due the same week. Your team drowns. Fixed-date PMs create workload tsunamis you can never escape.

Missed PMs = expensive breakdowns

Asset Data Black Hole

A chiller fails. Your technician asks "What model? When installed?" You dig through filing cabinets and emails. 45 minutes later, still no answer.

Delayed repairs = tenant complaints

Stop Guessing. Calculate Your FCI.

FCI is the industry-standard metric for capital planning. AssetLab calculates it automatically for every site, building, and system class.

Interactive FCI Calculator

$2.5M
$18.0M
FCI = Deferred Cost / CRV x 100
13.9%
Poor

FCI Thresholds Explained

0-5%Good

Facility in excellent condition

5-10%Fair

Normal wear, routine maintenance

10-15%Poor

Significant deferred maintenance

15%+Critical

Major capital investment needed

10-Year FCI Forecasting

AssetLab automatically forecasts your FCI for the next 10 years based on asset lifecycles and inflation.

Rolling PM Schedules Prevent Workload Tsunamis

Fixed-date PMs create chaos when 40 tasks pile up the same week. AssetLab's rolling PM schedules distribute work evenly.

ROLLING: Completion-based Scheduling

Next PM due date calculated from LAST COMPLETION DATE. Quarterly PM completed April 5? Next due July 5.

Workload Distribution Magic:
  • PM #1 completed April 1 → Next due July 1
  • PM #2 completed April 5 → Next due July 5
  • Work automatically spreads across time!

Visual Comparison

FIXED Mode Workload
March
40
June
40
September
40
December
40

Tasks pile up at quarter-end

ROLLING Mode Workload
Q1
~13/mo
Q2
~13/mo
Q3
~13/mo
Q4
~13/mo

Tasks evenly distributed

Work Order Management: 4 Statuses. Complete Visibility.

NEW → ASSIGNED → IN PROGRESS → COMPLETED. Four views (List, Cards, Calendar, Kanban). Mobile QR scanning. Self-service portal.

3-Tier System Classification for Precision Tracking

System Class → System Group → System. Track FCI, depreciation, and work orders at any level.

HVAC Systems Taxonomy

Cooling Equipment
Central Chiller
Cooling Tower
Split System AC
Heating Equipment
Gas Boiler
Heat Pump
Radiant Heating
Air Distribution
Air Handler
VAV Box
Exhaust Fan

Why 3 Levels Matter

Level 1: System Class

High-level reporting. "What's our HVAC FCI?" Board-level insights.

Level 2: System Group

Department-level tracking. "Cooling Equipment FCI is 18%—we need capital."

Level 3: System

Asset-level precision. Tag every asset to specific system. Know exactly what to replace.

Real Facility Managers. Real Results.

From commercial offices to universities—facility managers use AssetLab to make data-driven decisions.

"Our CFO asked for a 5-year capital plan. I pulled AssetLab's FCI forecast and had a $8.2M capital request with full justification in 15 minutes."

Jennifer Martinez
Director of Facilities
Corporate Campus (12 buildings)
$8.2M capital plan in 15 minutes

"We had 89 quarterly PMs all hitting March 31. Switched to rolling PM schedules. Workload is smooth. Team is happier. Compliance is 100%."

Michael Chen
Facilities Manager
Mixed-Use Development
100% PM compliance

"Technicians scan the QR code and see the full asset record—manufacturer, model, serial, last 10 work orders. Saved us 30+ minutes per emergency call."

David Thompson
Maintenance Supervisor
University (18 buildings)
30 min saved per call

"We track 1,847 assets across 6 sites. Now I see site-level FCI, building-level FCI updated live. Board asks "What's our deferred maintenance?" I pull up the dashboard. Done."

Sarah Williams
VP of Facilities & Operations
Multi-site Portfolio
1,847 assets tracked

Ready to Stop Fighting Spreadsheets?

Join facility managers who've traded Excel chaos for AssetLab control. Free trial. No credit card. Full feature access.